Communication interface
Transit speed
Card reader windows
Maintenance windows
Time for opening or closing
Starting time after power on
Working environment
Temperature
Relative humidity
Installation instruction
1.
Installation on the ground
First of all, earthwork, a concrete base foot of 200mm height for anti-humidity
(hereinafter called Safe island) should be built. Then, power cable of
220V3 x 1.5mm and two 4 x 0.5mm (12 cores)control cables should be laid under
the middle of the casework.Fix the mechanism on the safe island.Connect it with
power of 220V and control cable should be linked to control room.
link cable
220V power cable
RS485 (standard)
30-40 persons/min
4
4
1 seconds
3 seconds
Indoor, outdoor( with a tent over)
-10°C ~ 50°C
≤90% no condensation
ENG
link cable
220V power cable
5