THE BOLD LOOK OF KOHLER K-4920-T Installation Guide página 4

Urinal
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Roughing-In Dimensions (Rear Spud)
• Roughing-In remains the same when using the optional 3" outlet
spud.
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary to
conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing as needed.
Provide a pit in the rough floor to allow for at least a 1" (2.5cm)
sand cushion under the stall.
1013946-2-B
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-4920-r

Tabla de contenido