Roughing-In Dimensions (Rear Spud)
• Roughing-In remains the same when using the optional 3" outlet
spud.
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary to
conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing as needed.
Provide a pit in the rough floor to allow for at least a 1" (2.5cm)
sand cushion under the stall.
1013946-2-B
4
Kohler Co.