JBL ProFlora Taifun S Manual Del Usario página 8

Ocultar thumbs Ver también para ProFlora Taifun S:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
UK
4. Collection cap to prevent CO
5. CO
hose JBL ProFlora T3
2
6. Holding clip with suction pad
Taifun M: 4 x
Taifun S: 1 x
Installation
• First thoroughly rinse the reactor in lukewarm water. Do not
use detergents.
• Fit the reactor vertically in the aquarium in a position where
there is a gentle current. The upper edge of the device should
be at least 2 cm under the surface of the water.
• Connect the CO
(e.g. JBL Proflora bio80 und bio160) to the hose connection
of the reaction vessel. With systems using pressurised gas
cylinders to the hose connection to the pressure regulator.
First let a few bubbles run through the device.
• At first the bubbles will flow intermittently through the spiral
bubble channel from the bottom to the top. The device
needs approx. 48 hours to set up. After 48 hours a bio-film
will have formed, allowing the bubbles to rise freely upwards.
As they rise, the bubbles will become smaller as a sign of
the diffusion of the CO
bubbles are at the top, they reach the collection cap where
any remaining CO
hose to the CO
2
into the surrounding water. Once the
2
can diffuse completely.
2
loss
2
source. With bio-CO
2
systems
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Proflora taifun m

Tabla de contenido