FOUNDATION OPTIONS
YOU MUST ASSEMBLE YOUR BUILDING ON A
WOOD FLOOR OR CONCRETE SLAB.
SITE PREPARATION
• Site must be properly leveled.
• Site should have natural drainage
and no standing water
A) Building the optional wood floor
frame.
Building Size
Dimensiones del edificio
8' x 7'8-5/8" (244 x 235cm)
Important: Square floor and level to ground
before beginning assembly of building.
B) Concrete Slab Foundation
Soleras Inferiors Tratadas
Building Size
Dimensiones del edificio
8' x 7'8-5/8" (244 x 235cm)
Fasten treated 2x4 sill plates to slab using approved
concrete anchors. (Fasteners not included.)
A
A
A
A
B
89-5/8" (228 cm)
96" (244 cm)
Treated Sill
A
A
A
B
85-5/8" (217 cm)
96" (244 cm)
OPCIONES PARA LA CIMENTACIÓN
HAY QUE CONSTRUIR EL EDIFICIO SOBRE UN BASE
DE MADERA O DE CONCRETO.
PREPARACIÓN DEL SITIO
• El sitio debe de estar nivelado correctamente.
• Instale una barrera contra yerbajos debajo de la
estructura.
A) El edificio del marco de suelo de madera
opcional.
C
92-5/8" (235 cm)
Importante: Asegure que el suelo está nivelado y
escuadrado antes de construir el edificio.
B) Base en losa de concreto
3-1/2"
(8.9 cm)
C
92-5/8" (235 cm)
Fije las soleras inferiores tratadas, de tamaño 2x4, a la losa
usando anclajes de concreto aprobados. (Los anclajes no
están incluidos.)
4
B C
B
C
4"
(10 cm)