3 Installation
The peeler must be installed on a level, non-skid work surface. During peeling
operation food product must be wet . By means of a 3/4" pipe bring water to feeding
nipple No.01 (picture 01). As an alternative it is possible to place the machine below a
3/4" water faucet and let the water flow in during the operation.
It is recommended to place the machine near by a water sink to allow wastes to flow out.
A drainage pipe may be connected to outlet waste No.10 (picture 01) to flow the wastes
out to the nearest sink.
Picture - 02
01
01 - Central Shaft.
02 - Central Shaft Pin.
02
4 Technical Data
Table - 01
Technical Data
Voltage
Frequency
Rating
Consumption
Height
Width
Depth
Net Weight
Gross Weight
Average Production
(*) All machines are wired for the voltage as ordered
2
Units
DB-06
[V]
110 / 220 (*)
[Hz]
50 or 60
[Hp]
0,25
[kW/h]
0,20
[mm]
535
[mm]
340
[mm]
440
[kg]
14,0
[kg]
16,0
[kg/h]
100