Descargar Imprimir esta página

Steelcase Migration SE Manual Del Instrucciones página 31

Ocultar thumbs Ver también para Migration SE:

Publicidad

®
Modular Version
NOTE: If receptacles are not
required inside a power block,
make sure to apply a receptacle
cover to ALL open ports.
17
WARNING: All electrical installations should be done by a qualified
person in accordance with codes and regulations applicable at the
installation site. Circuits should be checked for proper voltage. Note
Chicago Only: Must be hard wired under authority of a permit by a
contractor licensed in the City of Chicago.
Two power blocks shown. Single power
block installs in left or right position.
NOTE: Steps 3a through 3c are also
required on all Power-In feeds.
Page 31 of 43
146381 Rev B

Publicidad

loading