Push the switch assembly (37) into the wall fitting so that the outer faceplate (41 ) is in contact with the pool wall
ensuring that the pneumatic tube does not get crushed. Line up the countersunk holes in the switch assembly with the
threaded holes in the
wall fitting (35) an insert the countersunk screws (42) without over tightening.
MOUNTING THE CONTROL PANEL
The control panel should be installed within 10 m of the poolwall fitting. It must be fitted in a dry environment, not in the
pump chamber. If these conditions are not met, warranty claims will not be honoured.
The 10 m length of pneumatic tube (40) from the wall fitting should be cut to length and attached to the 'T' connector
(43) beneath the control panel (44). The 10 m length of pneumatic tube should not be lengthened or extended beyond
18 m maximum.
Please consult appropriate wiring diagrams, three phase or single phase before construction work commences in order
that appropriate duct arrangements may be made.
A 30 mA earth leakage circuit breaker (R.C.C.B.) must be installed before the control panel.
7
11