Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

DANGER:
Amputation Hazard
Contact with moving parts inside chute will cause serious injury or death.
Shut off engine before unclogging discharge chute.
Use clean-out tool, not hands!
WARNING:
Failure to read and follow the Operator's Manual and all operating instructions
can result in serious injury or death.
WARNING:
Fuel and its vapors are flammable and explosive. Turn off engine and wait at least
2 minutes before refueling. Let spilled fuel evaporate before starting engine.
Auger
Engage
Control
Traction
Control
Chute
Rotator
Control
Split
Rod
Fuel Cap
Chute
Oil
Clean-Out
Dipstick
Tool
You Will Need:
• Utility knife
• Unleaded fuel
• Tire pressure gauge
• 1/2" combination or deep socket wrench
• 9/16" combination or deep socket wrench
• 7/16" wrench
Remove Packaging Materials
Note: Follow setup instructions in the order presented.
1.
Remove banding from crate. Open carton completely by
cutting each corner from top to bottom as shown.
2.
Open small cardboard box behind snowthrower. Remove
parts bag from inside chute. Remove manual packet.
Ensure you have all "Items Included" prior to assembly.
3.
Locate the operator's manual in the manual packet.
Always read and follow the instructions in the operator's
manual. Proper care, performance tips, and safety
information are located in this important document.
Raise Handles and Check Cables
Note: "Right" and "Left" are from the Operating
Position.
1.
Cut orange zip ties that secure control cables to handle
assembly. Be careful not to cut or damage the control
cables.
2.
Rotate upper handle assembly (A) up.
2
3.
Slide large carriage bolts (h) and 5/16" flange lock nuts (a)
into lower holes. DO NOT TIGHTEN AT THIS TIME.
4.
Remove shipping rubber bands from control levers. Make
sure the "Z" bend ends of the control lever cables are
secured in the holes on the control levers as shown.
5.
Make sure auger engage control and traction control
cables route over the top of cable buttons as shown.
6.
Check that all cables can move freely and are not kinked.
7.
Tighten upper and lower nuts in handle with a 1/2"
wrench or deep socket.
3
Install Chute Rotator Control Handle
1.
Install thin jam nut (b) onto chute rotator rod. Install chute
rotator control handle (f) onto chute rotator rod turning at
least 10 full clockwise rotations.
5
2.
Align chute rotator control handle so it is facing forward
and use a 9/16" wrench to tighten jam nut (b) against
chute rotator control handle (f).
3.
Slide chute rotator control handle to the right.
Copyright © 2008. All rights reserved. No part of this material may be reproduced or transmitted in any form by any means without the express written permission of Briggs & Stratton Power Products Group, LLC.
Every effort has been made to ensure that the information in this document is accurate and current.
However, we reserve the right to change, alter or otherwise improve the product and this document at any time without prior notice or obligation.
Two-Stage Snowthrower
Items Included:
k
a
g
n
h
b
p
c
m
d
j
e
f
q
Make sure you have all items before assembly.
5/16" Flange Lock Nuts, 2
k Extra Shear Pins, 2
a
5/16" Jam Nut (thin), 1
m Extra Cotter Pins, 2
b
c 3/8" Flange Nuts, 2
n Small Carriage Bolts, 2
d 5/16" Lock Nut, 1
p Zip Ties, 3
e 1/4" Lock Nuts, 2
q Ignition Keys, 2
f Chute Rotator Control
(1 pre-attached to snowthrower)
Handle, 1
g 5/16" Lock Washer, 1
Items not shown above:
h Large Carriage Bolts, 2
Operator's Manual
j 120V Power Cord, 1
Illustrated Parts List
Product Registration Card
Engine Manual
Fresh Start® Fuel Preserver
Cartridge
1
1
2
A
3
3
h
a
4
4
5
f
b
Models No. L1226E, L1428E
Connect Shift Rod
1.
Connect shift rod (B) to shift lever (C) and secure with
lock washer (g) and 5/16 lock nut (d). Tighten lock nut
with a 1/2" wrench while preventing stud (E) from turning
with a 7/16" wrench.
6
Assemble Chute and Rotator
1.
Bring chute from pallet to the left side of snowthrower.
2.
Slide the chute base (F) onto the auger housing (G).
3.
Slide support tube (H) on the carriage bolts (J).
4.
Thread two 3/8" flange nuts (c) onto carriage bolts and
tighten with a 9/16" wrench.
8
Assemble Split Rod
1.
Take end of split rod (K) that is attached to top back side
of chute assembly and align it to right side of split rod
protruding from dash.
9
2.
Insert two small carriage bolts (n) into square holes of
split rod.
3.
Install 1/4" lock nuts (e) and tighten hardware with a
7/16" wrench.
Connect Spout Rotator Brake Cable
1.
Slide spout rotator brake cable (L) between dash and the
handle cross bar as shown.
10
2.
Slide rubber dust cover (M) off of plastic fitting as shown.
3.
Place "Z" bend of cable (N) into hole of brake lever
assembly (P).
4.
Pull plastic fitting (Q) behind bracket (R).
5.
Slide chute rotator cable (S) between slot in bracket and
push forward to lock in place.
12
6.
Slide rubber dust cover (T) over plastic fitting.
Remove Snowthrower From Crate
1.
Cut straps from between snowthrower and wood pallet
by wheels and auger.
2.
Roll snowthrower off crate.
Secure Cable and Final Checks
1.
To prevent chute deflector cable from contacting tire,
rotate chute all the way to the left and secure with zip ties
(p). Secure cable to left handle (U) and to support tube
(V), and secure speed selector cable to split rod (W).
2.
Reduce tire pressure to 14 PSI. (Tires are over-inflated
for shipping purposes.)
3.
Check that clean-out tool is attached to snowthrower.
(See assembled figure.)
Always use a clean-out tool to clear clogged discharge
chute. NEVER use your hands.
4.
Locate two shear pins (k) and cotter pins (m) in parts bag.
Place hardware in compartment labeled "Replacement
Shear Bolt Storage" located on unit behind chute.
Check Oil Level and Add Fuel
Note: Engine is shipped with oil. See Engine Manual
for complete engine oil specifications and maintenance
requirements.
1.
Remove oil dipstick (X). Check oil level. Oil level should be
between FULL and ADD marks. Reinstall oil dipstick.
2.
Remove fuel cap (Y). Following the three-step
instructions on the Fresh Start card, snap the fuel
preserver cartridge into the bottom of the fuel fill cap.
NOTICE: Do not use E22 or E85 fuel.
NOTICE: Do not mix oil with fuel.
WARNING:
Fuel and its vapors are flammable and
explosive. Turn off engine and wait at least
2 minutes before refueling. Let spilled fuel
evaporate before starting engine.
3.
Add clean, fresh, UNLEADED fuel with a minimum 87
octane. Leave one inch of space at top of tank for fuel
expansion. Reinstall fuel cap.
Read Manual Before Starting Engine
Follow procedures and safety instructions in Operator's
and Engine Manuals.
DANGER:
Amputation hazard
Contact with moving parts inside chute will cause
serious injury or death. Shut off engine before
unclogging discharge chute. Use clean-out tool,
not hands!
WARNING:
Failure to read and follow the Operator's
Manual and all operating instructions can result
in serious injury or death.
6
d g
C
E
7
7
F
G
J
8
9
11
e
n
n
e
10
P
L
M
N
13
11
R
Q
12
T
14
13
W
V
14
13
Y
X
TP-1000-4956-00-LW-SN
Form No. 1736892
B
H
c
K
S
U

Publicidad

loading

Resumen de contenidos para Snapper L1226E

  • Página 1 Two-Stage Snowthrower Models No. L1226E, L1428E Connect Shift Rod DANGER: Amputation Hazard Contact with moving parts inside chute will cause serious injury or death. Connect shift rod (B) to shift lever (C) and secure with Shut off engine before unclogging discharge chute.
  • Página 2 Removedor de nieve en dos etapas Modelos N.° L1226E, L1428E Conexión de la varilla de deslizamiento PELIGRO: Peligro de amputación Conecte la varilla de deslizamiento (B) a la palanca de cambios El contacto con piezas móviles dentro de la rampa puede provocar lesiones graves o incluso (C);...

Este manual también es adecuado para:

L1428e