Barrette Shower Stall Kit Instrucciones De Instalación página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Measure and Mark Post Layout
Measure, mark and "square" posts according to
dimensions. Use "Corner to Corner Diagonal"
dimension as a reference to ensure that posts are
squared (Fig. 1).
2.
Post Installation
a. Dig a 3 foot deep by 10 inch diameter hole
for each post footing (Fig. 2). Use a post hole
digger or an auger.
b. Slide 4x4 vinyl posts over 4x4x96" lumber so
that 2 feet of lumber is extended below vinyl
posts. Secure lumber to posts with galvanized
screws (not included) below nish grade (Fig. 3).
c. Insert posts and double-check measurements.
Pour pre-mixed concrete into holes and use a
post level to make plumb
Corner to Corner Diagonal:
Roughly 60"
42-1/4"
42-1/4"
42-1/4"
42-1/4"
Ground
Concrete
1" Vinyl
Vinyl Post
Vinyl Post
4"x4"x96"
Lumber
3' Footing
Fig. 1
Fig. 2
3" Wood
10" Footing
Diameter
Fig. 3
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bom-34107930

Tabla de contenido