Descargar Imprimir esta página

Physical Installation; Tabletop Deployment; Initial Setup And Network Connectivity - Dell PowerConnect W-620 Guia De Instalacion

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
The following tools and equipment are required for installation of a W-620 Series controller.
AC Power Cord (country-specific)
Any ethernet cables required for your deployment

Physical Installation

Tabletop Deployment

To deploy an W-620 Series controller on a flat surface, such as a tabletop:
1. Insert the four rubber mounting feet to the bottom of the unit.
2. Place the unit on a hard flat surface.

Initial Setup and Network Connectivity

Once the physical installation is complete, run the initial setup on the controller to configure the IP address and
other basic system information. For complete details and instructions, refer to the Dell PowerConnect ArubaOS
Quick Start Guide for the software version installed on your controller.
Dell PowerConnect W-620 Controller | Installation Guide
All manuals and user guides at all-guides.com
Chapter 2
W-620 Series Installation
W-620 Series Installation |
13

Publicidad

loading