INSTALLATION
Mounting the Control Panel
Mounting the Control Panel
1. Remove any float switch that is currently used or supplied with the
pump.
• If the float switch cannot be removed, secure it so it is always on.
2. Attach the 2 mounting flanges to the control panel enclosure.
3. Mount the control panel within 6 feet of an electrical outlet.
4. For models with an overload relay, set the relay dial to the full load
amps of the pump.
IMPORTANT: Do not plug the unit into power until the rest of the
system has been installed.
NOTE: The pump motor may start immediately if the
overload is reset.
4