Glacier bay HD67540-1008D2 Guía De Instalación Y Cuidado página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
10
Installing the sensor cable
Install the sensor cable (1) to the connection (2) of the
and the pillars (4) on the
tightly connected by firmly pushing together.
If it is necessary to remove the timer (O), squeeze the tabs (5 & 6) on
at the same time.
CAUTION: If the connections are made properly, the base of the control valve will flash red for 2 seconds and flash for 3 times, the
timer (O) will work. If the connections are not made properly, the timer (O) will not work.
4
6
timer
(O) are aligned to one another to ensure proper installation. Ensure they are
1
3
2
5
timer
(O). Ensure the holes (3) on the sensor cable (1)
the sensor cable (1) and
12
timer
(O)
O

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hd67540-1010hHd67540-10011004553918314716941310471037

Tabla de contenido