Urinal installation Instructions
Model : Terra I
Include Spud 3/4", Flange 2"
Pre- Instalation
-Refer to manufacturer of flux-o-meter valve instructions for valve requirements.
-Check for any damage to the new urinal before installation.
-Site preparation may require additional tools and hardware.
-A urinal is heavy, make sure the wall is strong enough to support the new urinal .
-Install or relocate the supply pipe and waste pipe as
necessary to comply with dimensions .
NOTA 1: Flange height installed on the drain
should be approximately 21 3/8 "
and the height the floor to the urinal
rim need be approximtely 24 "
1.- Bolts
2.- Washers
3.- Flange 2"
4.- Adapter 2" (not included)
5.- Wall Anchors , Washers and
Bolts (not included)
Preparation
1.-Install the adapter to waste pipe threading it or sticking it
accordingly.
2.-Remove the flange from urinal, apply thread sealant to waste
5
pipe and install the flange on pipe, make sure bolt holes falange
are leveled and parallel to floor, the flange should be to the ratio
of the wall.
3.- screw the Urinal to Flange, leveled and after mark the fixing
points , there are in the upper part the urinal , remove the flange
screws .
4.- Drill the fixing points , use wall anchors and again install the
urinal with the flange and then use the washers and bolts ( not
included ) .
5.-Install the fluxometer according to manufacturer's instructions
6.-Turn on water supply line
7.-Flush urinal several times and check the entire installation for
Leaks
Do not overtighten the bolts as product damage can occur
Recommended pressure for good working of this product is 35
PSI.
Avoid abrasive products to clean the urinal
This product is guaranteed for manufacturing defects for five years in ceramic and
1 year on hardware, from the date of purchase. It is considered out of this warranty,
if the user changes any of the original parts of the product.
The consumer can request the physical change of the product, the retailer where it
was purchased, by presenting the product in its original packaging, this policy and
proof of purchase.
Calidad Total en Cerámica SAPI de CV , Antiguo camino a la Huasteca #350, Zona Industrial el Lechugal
C.P. 66350, Santa Catarina N.L. México, Service Telephone throughout the Republic +52 (81) 8262-8899
servicioacliente@cato.com.mx
WARRANTY

Publicidad

loading

Resumen de contenidos para CATO Terra I

  • Página 1 6.-Turn on water supply line 7.-Flush urinal several times and check the entire installation for Leaks 1.- Bolts Model : Terra I Do not overtighten the bolts as product damage can occur 2.- Washers Include Spud 3/4”, Flange 2” 3.- Flange 2”...
  • Página 2 5.-Instale el Fluxómetro (ver instructivo del fabricante) y accionarlo 3 veces para descartar fugas. 6.-Activar la línea de suministro de agua. 1.- Tornillos Modelos : Terra I 2.- Arandelas 7.- Accione varias veces y verifique que no existan fugas Incluyen Spud 3/4”, Brida 2”...