3
Remove base from corner and drill 3/16" pilot holes in
flanges where stud locations have been marked.
5
5"
(12,7cm)
Ensure that the waste pipe is properly located to
align with the drain assembly (not included).
The opening should be 5" in diameter maximum. The
drain pipe should be flush with the subfloor.
92458 Rev. A
4
Install drain following manufacturer's instructions.
NOTICE: Plumber's putty will degrade shower
base material. DO NOT use plumber's putty to seal
between drain and base or property damage may
occur. Use sealant or gasket.
6
A.
Flat and Level Floor
B.
Uneven Floor
If subfloor is flat and level, and mortar was not used,
A.
apply adhesive
trowel, staying within pencil line (1). Proceed to step 7.
If subfloor is not flat and level, it is recommended
B.
to put down a mortar bed where the base will be
positioned.
Apply a generous amount of mortar (1) that has been
mixed to a thick consistency. Use the mortar to fill in
low areas. Place the base in the wet mortar, adjust until
it is level, and let mortar cure for 24 hours. Proceed to
step 7.
4
1
2
1
A
on floor using 1/4" square-notched
A
1