Descargar Imprimir esta página

TANDD Terminator ZP Guia De Inicio Rapido página 3

Publicidad

Terminator
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to
aid in piercing grommet. Leave additional
cable for expansion loop. See page 4 for
multiple cable installation tips.
4.
Insert banding guide into expediter and snap
into place..
7.
Terminate cable with appropriate PETK termi-
nation kit. Refer to PETK installation instruc-
tions.
ZP
TM
2.
Insert cable into expediter. If mounted on bot-
tom or side of pipe, punch out weep hole.
5.
Mount expediter to pipe using pipe band. Do
not band over cable.
8.
Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion
loop to pipe.
INSTALLATION PROCEDURES
3.
6.
9.
3
Slide expediter toward pipe and route cable
through support base entry.
Cut off end of cable. .
Mount junction box base on expediter. Make
sure to align slots to properly orient junction
box base. Tighten nut with Terminator-LN-
Tool. If mounting horizontally, threaded gland
holes must face downward.

Publicidad

loading