Pfister KENZO LG40 Serie Manual De Instrucciones página 3

Ocultar thumbs Ver también para KENZO LG40 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7
A
B
7 FLUSH WATER LINES
A. Point lines into Bucket. TURN WATER BACK ON.
B. Flush the water lines. Allow water to run for at least 30 seconds. TURN WATER
BACK OFF BEFORE CONTINUING INSTALLATION.
8
8A
8D
8C
8B
HOT
8 WATER SUPPLY CONNECTIONS
Gently separate hot and cold Supply Tubes (8A), approximately three inches apart.
Connect water Supply Lines (8B) to Faucet Inlets (8C). Hot water supply line goes to hot
inlet fitting indicated by red tag (8D). (Supply lines not included). Follow manufacturer's
instructions when installing supply lines. Do not twist Supply Tubes (8A)!
ENGLISH
8A
8C
8B
COLD
DRAIN BODY INSTALLATION
9
8A
9 DRAIN INSTALLATION
Install and adjust Drain (9A) using separate instructions supplied with the Drain assembly.
For T40-YP models, grid strainers must be ordered separately! For sinks with an
overflow, order T47-9GS*. For sinks without an overflow, order T47-7GL*.
10
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kenzo lg40-df0cKenzo lg40-df0k

Tabla de contenido