Assembly(continued)
5.Put the O ring (A) to the front of the pump body. Insert the venturi (D) into the upper pump port. Ensure the tabs
and slots align.
6.Alternately tighten the clamp screw and tap the clamp (B) with a mallet to seat the O-ring (A).
7.Install the pipe, foot valve and well seal.
4