Complete The Installation - Kohler 99702-NA Guía De Instalación Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Controller
Data
Cables
Valve Cable

8. Complete the Installation

IMPORTANT! Make drip loops in all cables.
IMPORTANT! Make sure all cables fully click into the sockets.
Connect the data cable(s) from the adapter into the eight-port
section of the controller.
Connect the 30' (9.14 m) valve cable into a valve port on the
controller.
Connect the 8-pin end of the valve cable to the valve.
Reconnect the power cable to the valve.
Verify all grommets are in place, then reinstall the door to the
valve.
To close the door, press on the tabs until the clips snap in place.
Turn on the power to the valve and connect the power to the
controller.
The interface is powered by the controller. The interface should
illuminate when power is connected to the controller.
Kohler Co.
Digital Valve
To
Adapter
Power
Cable
Valve
Cable
Drip Loop
11
1233354-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido