Check all items for shipping damage. If heater is damaged, promptly
inform dealer where you bought heater.
You should have the following assembly parts:
Cabinet Base Assembly (1), Wheel (2), Lightpost Panel (4), Gas Light Top Assembly (1), Propane Tank Retention Chain (1), Retention
Hook (2), Hardware Package (1) (see pages 8 thru 11 in your owner's manual).
Estimated assembly time: 25 minutes
Tools required:
• #2 Phillips screwdriver
• 1/4" Open end wrench
Hardware packet provided with heater may contain more parts than
needed for heater assembly.
Hardware packet contains the following items shown on pages 8
through 11 in your owner's manual):
Electronic Ignitor (1), Valve Knob (1), Propane Tank Retention Chain
(1), Retention Hook (2), D Batteries (2) and AA Battery (1).
Parts are referenced by designated letter throughout assembly
instructions. Hardware packet contains the following (quantity used
in parenthesis):
Description
A 2
/
" Hex Bolt (2)
1
4
B 1/4-20 Hex Bolt (2)
C 3/8" Self tapping screw (18)
A
B
GAS LIGHT PATIO HEATER
ASSEmbLy InSTRucTIOnS
unPAckInG HEATER
ASSEmbLy
Part No.
HC4-18C
NPC-4C
119620-02
C
mOdEL PGLHb36
Remove all packing items applied for shipping except inner pack
shown below.
Inner Pack
(leave in
position at
this time)
Lightpost
Panels
Electronic
Ignitor
Hardware
Packet
Lightpost
Top
1. Turn base upside down. Attach 2 wheels, 2 hex bolts (A) and 2
nuts (B). Do not overtighten.
Gas Light Top
Assembly
Gas Light
Cabinet Base
Assembly