Prepare Window For Installation; Install The Outer Case - GE AKLK18 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
5. PREPARE WINDOW FOR
INSTALLATION
A. Measure the width of the window opening.
B. Mark the center line on the inside windowsill.
A
B
A. Width of window opening
B. Center line
6. INSTALL OUTER CASE IN
WINDOW
A. Place outer case in window. Lower sash until it
rests behind the top rail. The bottom mounting rail
must rest behind window sill.
Top rail
Window sash
SILL
12
About
About
Bottom rail
6. INSTALL OUTER CASE IN
WINDOW (cont)
B. Align the case with the center line marked
on the sill.
C.
Long Hex-head
You may want to pre-drill holes into the sill.
7. ATTACH THE GROUNDING
WIRE TO THE CASE
A. Locate ground wire and two ground screws in
accessory pack.
B.
Secure one end of ground wire to outer case
in ground hole location (shown below) with a
grounding screw.
Here
C. Pull the other end of the wire forward, out of the
case. Position towards the right.
49-5000525 Rev. 0

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Aklk24

Tabla de contenido