Kohler K-683 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-683:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3-5/8" (9.2 cm)
4-1/2" (11.4 cm)
8-1/2"
(21.6 cm)
3/16" (5 mm) Min –
2" (5.1 cm) Max Depth
Roughing-In
Before You Begin
Observe all local plumbing, building, and electrical codes.
Read these instructions and determine all required components along with their installation
locations before beginning this installation.
A licensed electrician should install a 120 V GFCI electrical outlet, within the stud framing, in close
proximity to the electronic valve. The interface(s) is/are powered through the connection(s) with the
valve.
Install the valve prior to installing the interface(s).
Kohler Co. reserves the right to make revisions in the design of faucets without notice, as specified
in the Price Book.
1043184-2-B
Clamp Arm
3-5/8" (9.2 cm) –
4-5/8" (11.7 cm)
Wall Cavity
Depth
7-5/8"
(19.4 cm)
1/2" (1.3 cm) Min Clamp
Arm Clearance
7-11/16"
(19.5 cm)
3-11/16" (9.4 cm)
Cutout Detail
8-Pin Interface Cable
30' (9.14 m)
4-Pin Auxiliary Interface Cable
30' (9.14 m)
4
Cutout
1/4" (6 mm) Min
Interface Lip
Clearance
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-685K-684K-686

Tabla de contenido