Terminal Block Option
iNSTALL THE fLOAT SWiTCH AND ALArM
Follow Tank Alert
EZ Indoor/Outdoor Alarm
®
Installation Instructions included.
iNSTALL THE PuMP SWiTCH
NOTE: Electrical rating of pump must not exceed 20
amps at 120 VAC or 20 amps at 240 VAC.
1. Follow mounting instructions included with pump
switch.
2. Determine the type of pump switch to be installed.
Select the installation diagram from Figure A that
corresponds to the type of pump switch being
installed. Run wires from pump switch through
conduit as shown in Figure A:
Two-Wire Pump Switch Wiring: Using positions
on the right side of the terminal block, connect
the black wire to position 2, the white wire to
position 3 as shown in Figure A (left diagram).
Double Float
Wiring: Using positions on the right
®
side of the terminal block, connect the black wire to
position 2, the white wire to position 1, the red wire
to position 3 as shown in Figure A (right diagram).
NOTE: Route pump power and alarm power cords
through conduit on left. Route control switch, pump
switch, and pump cords through conduit on right.
figurE A
OR
2-WIRE
PumP SWITCH
WIRE SIZE 12-24 AWg
Tank Alert
EZ indoor/Outdoor Alarm
®
DOubLE FLOAT®
PumP SWITCH
Wiring instructions
ELECTRICAL SHOCK HAZARD
Disconnect power before installing or servicing
this product. A qualified service person must
install and service this product according
to national and local electrial codes. Do not
install in hazardous locations as defined by the
National Electrical Code, ANSI/NFPA 70.
iNSTALL THE PuMP
1. Run wires from pump through the same conduit as
the pump switch wiring as shown in Figure B.
2. On the left side of the terminal block, connect the
black wire to position 3, and on the right side of the
terminal, connect the white wire to position 1, and
the green wire to position 4 as shown in Figure B.
3. Run wires from pump power source through
conduit as shown in Figure C. This source should
be on a separate circuit from alarm power.
4. Using positions on the left side of the terminal
block, connect the white wire to terminal position 1,
the black wire to terminal position 2, and the green
wire to terminal position 4 as shown in Figure C.
5. Turn power on and tip pump switch to check
installation. Turn power off.
6. Finish installing alarm panel according to Tank
Alert
EZ Installation Instructions.
®
figurE B
WIRE SIZE 12-24 AWg
figurE C
WIRE SIZE 12-24 AWg