Putting Into Operation; Instructions For Correct Use, Safety Instructions - Brill LG 12 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59

6. Putting into operation

Plug mains plug (1) into the wall socket
GB
and plug-in connector (2) into the port
on Brill power pack A12(e) Art. 62901.
The charging sequence is started.

7. Instructions for correct use, safety instructions

Always use the equipment solely for
the purpose described in the operating
instructions.
Charge the power pack prior to first
start-up for a full 24 hours please.
During charging, the mains plug (1) will
slightly warm up.
18
Make sure that the mains voltage is
correct.
Only use the charger in dry rooms and
never in direct sunlight.
Make sure that no easily inflammable
substances are located next to the appli-
ance during charging.
Use this charger for only charging the
Brill power pack A12(e).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

61619

Tabla de contenido