Installation Instructions C3PC-2-D-Emergency Power Control
Emergency Power Control
Risk of Fire, Electrical Shock, Cuts or other Casualty Hazards- Installation and maintenance of this product must be performed
by a qualified electrician. This product must be installed in accordance with the applicable installation code by a person
familiar with the construction and operation of
the product and hazards involved. For continued protection against shock hazard replace all covers and guards after field
wiring is completed.
Before installing or performing any service, the power MUST be turned OFF at the branch circuit breaker. According to NEC
240-83(d), if the branch is used as the main switch for a fluorescent lighting circuit,
the circuit breaker should be marked with "SWD". All installations should be in compliance with the National Electric Code and
all state and local codes.
Risk of Personal Injury- Due to sharp edges, handle with care. Always use at least two people when lifting and mounting heavy
or large units
Failure to comply with these instructions may result in serious injury (including death) and property
damage.
DISCLAIMER OF LIABILITY: Cooper Lighting Solutions assumes no liability for damages or losses of any kind that may arise from
the improper, careless, or negligent installation, handling or use of this product.
IMPORTANT: Read carefully before installing product. Retain for future reference.
NOTICE: Product may become damaged and/or unstable if not installed properly.
Note: Specifications and dimensions subject to change without notice.
ATTENTION Receiving Department: Note actual product description of any shortage or noticeable damage on delivery receipt.
File claim for common carrier (LTL) directly with carrier. Claims for concealed damage must be filed within 15 days of delivery. All
damaged material, complete with original packing must be retained.
NOTICE: All new wiring must be fully verified before applying power.
NOTICE: Designed for indoor installation and use only. Dry location rated.
WARNING
Greengate

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Greengate CEPC-2-D

  • Página 1 Greengate Installation Instructions C3PC-2-D-Emergency Power Control Emergency Power Control WARNING Risk of Fire, Electrical Shock, Cuts or other Casualty Hazards- Installation and maintenance of this product must be performed by a qualified electrician. This product must be installed in accordance with the applicable installation code by a person familiar with the construction and operation of the product and hazards involved.
  • Página 2: General Information

    “ON” position. Normal & emergency lights wiring diagram & connect wires, one at a time, in accordance Control, CEPC-2-D. Wire input #1 or #2 and neutral are connected time, in accordance with the numeric identification. In order to should turn on.
  • Página 3: Frequently Asked Questions

    L de l’interrupteur de la pièce active la commande de puissance génératrice ou de l’onduleur. Apposez une étiquette autocollante d’urgence CEPC-2-D de Cooper. Le fil d’entrée n° 1 ou n° 2 et le de mise en garde de 5 x 7,5 cm (2 x 3 po) sur chaque luminaire fil neutre sont raccordés à...
  • Página 4: Questions Fréquemment Posées

    Essai de fonctionnement normal : Mettez l’interrupteur de raccordez les fils, un à la fois, conformément à l’identification NON, utilisez le modèle CEPC-2-D pour les gradateurs 0-10 V et la pièce ou d’un autre dispositif de commande en position numérique. Afin de fournir une intensité d’éclairage sécuritaire, « ON »...
  • Página 5: Información General

    2” x 3” (50,8 x Cooper, CEPC-2-D. La entrada del cable n.º 1 o n.º 2 y el neutro Especificaciones Eléctricas Especificaciones Mecánicas 76,2 mm) en cada luminaria o carga controlado por un CEPC- están conectados internamente a un circuito de detección.
  • Página 6: Preguntas Frecuentes

    SÍ, reemplace el interruptor de pared unipolar arriba por un interruptor de tres (3) vías. Puedo usar el CEPC-2-D con conmutación A/B? SÍ, pero necesita un CEPC-2-D por separado para cada ramal de cambio de vía (es decir, 2 CEPC-2-D para conmutación A/B). Puedo usar el CEPC-2-D con reguladores? NO, use el modelo CEPC-2-D para reguladores de 0-10 V y el...

Tabla de contenido