Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
D. STARTING UP
1
Check that the reactor BIO-UV is properly mounted on your installation.
2
Start your installation to fill the pipes with water.
Purge the air of the reactor:
- close the valve upstream of the reactor,
- unscrew the drain plug on the top of the body reactor,
3
- open the valve upstream of the reactor slowly and close it when the water is
forced out through the drain plug,
- re-tighten the drain plug and open the valve upstream of the reactor.
4
Check the water tightness of the unit.
Check that the electrical connection of the UV unit is compliant.
5
Check that the top of the reactor is correctly positioned.
Set the ON/OFF UV unit switch to the ON position and check that the lamps
6
are working properly: the indicator light for each lamp should be lit.
7
Check that the hour counter is running.
TTPE_AM-GB.doc
Marque, Modèles et Brevets déposés - Produits exclusifs
Copyright BIO-UV - 26/11/2009
Page 8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hdpe 3315 amHdpe 4315 amHdpe 5315 amHdpe 6315 amHdpe 7315 am

Tabla de contenido