ASSEMBLY INSTRUCTIONS
6. Insert the hose (K) through the small hole of the
base (I).
7. Insert the supply lines (F) one by one through
the large hole of the base (I).
Note: Ensure water supply line (blue) is in front
of water supply line (red).
8. Insert the quick connect tube (D) through the
large hole of the base (I).
Note: Ensure water supply lines (F) and hose
(K) are aligned in order.
6
6
6
7
Small hole
7
8
8
Big hole
8
8
Big hole
6
K
I
F
I
D
I
F
K