Kohler K-1190 Manual Del Usuario página 3

Ocultar thumbs Ver también para K-1190:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

When using wood
construction,
construct 2x4 or
2x6 stud framing
according to the
roughing-in
information
Provide a 1/16" (2mm) gap
between the bath rim and
framing.
1. Prepare the Site-Wood Construction
NOTICE: Unless otherwise specified, floor support under the bath must provide for a minimum of 80 lbs./square
foot (390 Kg./square meter) loading.
NOTICE: Do not support the bath by the rim.
- Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and level.
- The bath should be installed in a drop in installation. Construct 2x4 or 2x6 stud framing designed for your
particular installation. Provide a 1/16" (2mm) gap between the bath rim and the stud framing. Frame the floor, or
construct a frame for a raised installation in accordance with the roughing in information packed with the bath.
- Carefully lay out and cut the rough deck material. Use the cut out template or refer to the roughing in cut out
information.
- Position the plumbing according to the roughing in information packed. Cap the supplies, and check for leaks.
2. Prepare the Bath
- Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the trap at this
time.
- Position a clean drop cloth or similar material in the bottom of the bath. Be careful not to scratch the surface of the
product.
Kohler Co.
Frame the floor
Position
according to the
the rough
roughing-in
plumbing
information
Verify that the subfloor
offers adequate support,
and is flat and level
3
A
1012560-2-

Publicidad

Tabla de contenido
loading

Tabla de contenido