Descargar Imprimir esta página

Work Pro W A 51 Manual De Uso página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

FS 2 for rigging configuration
1.
Place the horizontal bar at the front of the main part using the supplied screws and nuts.
Its position is displayed as the attached drawing. The parallels pins are at the bottom side to
fit perfectly with the upper satellite side.
2. Screw the "U" shape accessory
on the bottom side of the central
piece using the supplied screws
and nuts.
3. Turn the entire assembly as shown in the
attached picture.
A 51
- 6 -
(
Accessory set for ARION 5
EN
)

Publicidad

loading

Productos relacionados para Work Pro W A 51