Installation & Initial Startup - Mustek Power Must 600 LCD Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation & Initial Startup
NOTE: Before installation, please make sure nothing inside of package is
damaged.
To protect your equipment from power failure, be sure that
EN
power switch must be kept in the "ON" position. Follow below steps to install
your UPS unit.
Connect to Utility & Charging
Plug in the AC input cord to the wall outlet. For the best results, suggest to
charge the battery at least 4 hours before initial use. The unit charges its
battery while connecting to the utility.
Connect the Loads
Plug in the loads to output receptacles on the rear panel of the UPS. Simply
turn on the power switch of UPS unit, then devices connected to the UPS will
be protected by UPS unit.
CAUTION: NEVER to connect a laser printer or scanner to the UPS unit.
This may cause the damage of the unit.
Connect Modem/Phone for Surge Protection (Only for the model with
RJ-11/RJ45)
Connect a single modem/phone line into surge-protected "IN" outlet on the back
panel of the UPS unit. Connect from "OUT" outlet to the computer with phone line
cable.
Connect Communication Cable (Only for the model with USB port)
To allow for unattended UPS shutdown/start-up and status monitoring, connect the
communication cable one end to the USB/RS-232 port and the other to the
communication port of your PC. With the monitoring software installed, you can
schedule UPS shutdown/start-up and monitor UPS status through PC.
Turn On/Off the Unit
Turn on the UPS unit by pressing the power switch. Turn off the UPS unit by
pressing again the power switch.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido