Putting Into Operation - Beta 3061/2T Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
INSTRUCTIONS FOR USE
PACKING
- The body, handle and other parts of the jack are packed in a three-layer corrugated cardboard box with pallet;
WKH RSHUDWLQJ DQG PDLQWHQDQFH PDQXDO SOXV WKH ZDUUDQW\ FHUWL¿FDWH LQ D IROGHU DUH DOVR LQVLGH WKH ER[
- The instruction "Keep upright" is clearly visible on the cardboard box containing the jack.
- Depending on the number of jacks shipped, pallets of different sizes are used.
- Either transpallets or forklift-trucks are used for handling.

PUTTING INTO OPERATION

CONNECTION TO THE COMPRESSED AIR SYSTEM
- Compressed air enters into the jack circuit through the quick coupling on the top of the manual lifting/
descending controls; it is therefore necessary to have a connecting pipe with a quick coupling compatible with
that of the jack. Check that the air supply pipe has a useful passage of at least 6 mm and it is not pinched or
restricted anywhere. DWG. 7
WORKING AIR PRESSURE: 8 - 10 BAR
- Absolutely never put the following into the compressed air circuit: hydraulic or Vaseline oil, brake liquid,
kerosene or other liquids.
 ,QVWDOO D ¿OWHU GHKXPLGL¿HUOXEULFDWRU XQLW LQ WKH FRPSUHVVHG DLU V\VWHP
- If you want to lubricate the compressed air circuit use exclusively:
AGIP OSO 100; MOBIL DTE 27; ESSO TERESSO 100;
SHELL TELLUS 100; BP ENERGOL HP 100
8
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido