Installation
1
Preparing for installation
CAUTION: Always turn off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
□
Drill 1-3/8 in. holes in the nished deck as
shown in the diagram below.
NOTE: This kit allows up to 1-1/4 in. deck thickness.
5 in. min.
3 in. min.
3
Installing the middle body
□
From underneath the deck, insert the middle
body (E) with the rubber washer (F), metal
washer (G) and nut (H) through the mounting
hole.
□
From above, thread the connector (D) onto the
middle body (E).
□
Tighten the nut (H) using a basin wrench, so that
the connector (D) sits ush against the nished
deck surface.
1-3/8 in.
1-1/8 in.
2
Remove the plastic cap and
flange
□
Remove the plastic cap and ange from body.
4
D
E
F
G
H