Electrical Connection - Swan Analytical Instruments Cleaning Module-II Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Cleaning Module-II
Installation
2.3.
Connection via
peristaltic
pump of the
analyzer
A-96.250.599 / 020620

Electrical Connection

Depending on the instrument, the electrical connection is made in
one of the following ways:
 AMI Codes-II, AMI Codes-II TC, AMI Codes-II CC, AMI Phos-
phate-II, AMI Phosphate HL: Proceed according to section
Connection via peristaltic pump of the analyzer, p.
 AMI SAC254: Proceed according to section
Direct connection to the AMI transmitter, p.
With this type of connection, the peristaltic pump of the Cleaning
Module-II is connected to the peristaltic pump of the analyzer.
WARNING
Electrical shock hazard!
Disconnect the AMI analyzer from the mains before connecting
the signal cable.
Proceed as follows:
1 Switch off the analyzer according to chapter 6 «Stop of Opera-
tion for Maintenance» in the corresponding manual.
2 Open the peristaltic pump of the analyzer:
–Release and remove the occlusion frames.
–Unscrew the 4 screws and remove the cover.
–Disconnect the motor connector [A].
9.
11.
A Motor connector
A
9

Publicidad

Tabla de contenido
loading

Tabla de contenido