EN
INSTALLATION - FIXING (CONTINUED)
Standard wiring
Break the 2 caps of the cover
with pliers
Cables go out via the 2
Close the cover by
orifices of the cover
pushing from upwards
Partition wall wiring
Cables go through the wall
Break the cap of
Close the cover by
pushing from upwards
To provide the required air circulation for cooling the solar charge controller, leave a 5 cm free space
(minimum) all around the product.
5cm
5cm
5cm
5cm
www.uniteck.fr
19/46