ASSEMBLY AND CONNECTION
Prepare
Assure compliance of technical data with mains voltage
and blind motor.
Put in 58mm flush-mounted socket and install cables.
Cabel: NYM-J 1,5mm².
Connect
Fig. 4: View from behind on the screw terminals
1
Open blind
2
Close blind
3
Neutral conductor
4
Phase conductor
Assemble
Fig. 5: Put controller in flush-mounted socket and fasten
with both screws (3,0x25mm). Attach frame and fasten with
both screws (2,9x9,5mm) than engage control unit.
Start running
Switch on mains voltage.
The display shows the basic setting.
(black)
(black)
N
(blue)
L
(brown)
GB
27