VessRAID Task List
•
•
•
•
•
•
•
•
•
•
Task 1: Unpacking the VessRAID
The VessRAID box contains the following items:
•
VessRAID Unit
•
Quick Start Guide printed
•
RJ11-to-DB9 serial data cable
•
Screws for disk drives
(70 pieces for 16-bay, 50 pieces
for 12- and 8-bay)
A Battery Backup Unit (BBU) is optional on the VessRAID subsystem. In the
event of a power failure, the BBU powers the controller cache to preserve any
data it contains.
•
There is a risk of explosion if the battery is replaced by the
incorrect type.
•
Dispose of used batteries according to the instructions that
accompany the battery.
Task 1: Unpacking the VessRAID
•
1.5m (4.9 ft) Power cords
(1700i models, 1; 1800i models, 2)
•
CD with SNMP files, Product
Manual and Quick Start Guide in
PDF format
Caution
3