Tools Required; Parts List - Foundations W000002 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ADULT INSTALLATION REQUIRED.
TOOLS REQUIRED:
Level (A)
Measuring tape (B)
Power drill with 7/32", 1/8" and 1/2" masonry bits (C)
Power screwdriver with bull nose phillips bit (D)
READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF Diaper Changing Station.
Unpack carton and identify all parts.
Parts Description
Hardware for installation:
3" Wood Screws
3/4" Finishing Washers
3" Machine Screws
3/4" Flat Washers
Toggle Anchors
1-1/4" Caps
Door / Wall Plate
3" Wood Screws
30.5"
(775 mm)
32"
(813 mm)
SI255E-Gen (EFS) 021413.indd 2
ASSEMBLY INSTRUCTIONS
PARTS LIST
For Wood Studs:
3/4" Finishing Washers
3/4" Flat Washers
Toggle Anchors
19.5"
(495 mm)
A
C
For Use With Toggle Anchors:
3" Machine Screws
1-1/4" Caps
A.D.A. Compliance:
306.3 Knee Clearance
307.2 Maximum Protruding Objects
308.2 Forward Reach
308.3 Side Reach
309.4 Operation
902.3 Work Surface
Compliant when properly installed.
1
B
D
Quantity
4
4
2
4
2
6
1
3/4" Flat Washers
Door / wall plate to be
mounted on outside of
restroom door.
2/14/13 1:34 PM

Publicidad

Tabla de contenido
loading

Tabla de contenido