Instruction Manual
CABLE MANAGEMENT
PROCEDURES
1.
Route cables as necessary.
2.
Secure cables using cable ties (see Figure 7).
3.
Cut and install cable wrap.
SECURITY INSTALLATION
1.
Using security wrench (provided), remove 5/16" standard
setscrew and replace using 5/16" security screw (see Fig-
ure 8).
2.
Remove two screws from bottom of Projector Interface
Plate, preferably one from each corner.
3.
Using security wrench and security screws from All-
Points Security package, secure Projector Interface Plate
to projector.
4.
Using security wrench (provided), replace screws in Pro-
jector Interface Plate with undercut sccurity screws from
top from top plate.
8
(OPTIONAL)
Cable Wrap
Cable
(4) Cable Tie
Figure 7. Cable Routing Example
Security Flat Head Screw
(2) #10-24 x .25"
Security Flat Head Screw
5/16-18 x .50"
Security Set Screw
Figure 8. Adding Optional Security
MSP-DCCC3504
(3) M3 x 16mm
#10-24 Phillips
Pan Head Screw
(remove 2)