Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Model No.:
Customer: Please record your model number. The model number is
found on the label located on the front panel of the box. It is very important
to record your model number. This information is necessary when
contacting us. If you have any questions on the installation of this unit,
please do not return to the store where you purchased it. For additional
help please visit www.mascobath.com, email
customerservice@mascobath.com or call 1-800-355-2721. If you have
purchased products in Canada and wish to contact customer service,
please contact Mirolin Industries Corp. www.mirolin.com,
info@mirolin.com, 1-800-647-6546. Mirolin Industries • 60 Shorncliffe
Road • Etobicoke, Ontario M8Z 5K1
Important! These instructions include suggestions for rough construction,
drywall installation and plumbing installation that we believe to be
reliable. Local building codes vary by location and could supersede
those suggestions. If you are not confident in your ability to perform
these tasks, you should use a professional installer or contract out
those tasks you need help with.
REQUIREMENTS FOR A SUCCESSFUL INSTALLATION
1. Read these instructions and confirm that tub will fit in the intended
alcove and that the drain end is located where required before beginning
installation.
2. The alcove wall studs should be located as shown in Illustration 1 and
be plumb. If the studs are not plumb, shimming may be required. It is
important that a stud is located as shown (*) for attachment of the
vertical flange on each side of the tub apron. Other studs should be
located according to local building codes.
• Rough plumbing must be installed before tub and/or wall panels.
Illustration 2 shows suggested location of fixtures if new plumbing
is being installed. Provide an access panel on the back side of the
wall with the plumbing fixtures. If plumbing exists, check that fixtures
will clear tub and panels. All plumbing must meet local building
codes.
• The tub must be installed on a solid and level sub-floor that is square
with the wall studs. The tub support must sit directly on a level sub-
floor.
• Use the cutout from the tub carton to protect the tub from damage
during installation.
• The tub and wall set should not be installed in areas where the
temperature may drop below freezing (32ºF or 0ºC).
• Allow tub and wall set to reach room temperature for 30 minutes
before installing.
Important: The alcove studs must be plumb and square to the floor!
Inside corners of the alcove should be square (refer to Illustration 3).
3. Special installations:
• Above the floor drains
Create a platform of 2 x 4's (or taller depending on drain requirements)
to raise the entire tub area and cover it with sub-flooring. This platform
must be level and square to the wall studs. When installing plumbing,
add platform height to the dimensions shown in Illustration 2.
• Masonry walls
Construct a 2 x 6 stud wall for the plumbing end. Apply 2 x 2 furring
strips to the masonry wall in the same locations as the studs in
Illustration 1.
• Installation over greenboard or firewalls
If you are installing wall panels over greenboard and/or firewall
material, and not directly on the studs, your dimensions must take
into account the thickness of this material and measurements should
be taken from the inside of the finished walls.
INSTALLATION MANUAL
DIVANI™ BATHTUB & WALL SET
15-3/8
14-5/8
Plumbing fixture side
16-3/4"
(right or left hand)
31"
31-7/8"
Additional stud if
end of wall
48" furring strip
Stud placement
and drain location
Illustration 1
Suggested rough plumbing locations
(right-hand installation shown)
Backer
board
Drain cutout
8" x 10" Max.
Centered on drain
Illustration 3
14-5/8
15-3/8
14-1/2"
Drain cutout
8" x 10" Max.
Centered on drain
60"
Tub Apron
Stud
Greenboard
Shower head
elbow
Access panel
location
81"
Mixing valve
Spout elbow
32"
Illustration 2
23"
8-11/32"
10"
12"
Each alcove
stud must
be plumb
and square.

Publicidad

Tabla de contenido
loading

Resumen de contenidos para MASCO Bath DIVANI

  • Página 1 INSTALLATION MANUAL DIVANI™ BATHTUB & WALL SET 8-11/32" Model No.: 15-3/8 14-5/8 14-5/8 15-3/8 Customer: Please record your model number. The model number is found on the label located on the front panel of the box. It is very important Plumbing fixture side 10"...
  • Página 2: Tools & Materials Required

    TOOLS & MATERIALS REQUIRED Installation requires common household tools and: • Level & square • Tape measure • Hammer • Pencil • 3/4” galvanized roofing nails • 2x4 lumber for additional wall studs (if required) • One cartridge each of caulk and adhesive, see specifications in wall set requirements below. •...
  • Página 3 Wall Set Installation If you will be installing a tub door, a backer board (note size in Locate and drill a 3/16” hole in the center of the nailing flange Figure 1) must be installed on the back of both side walls. Apply at the top of the panel and centered on each stud (Figure 4).
  • Página 4: Care And Cleaning

    Figure 6 Masco Bath www.mascobath.com P/N27723 Rev. B 5/09 ©2009, Masco Bath Printed in USA/Impreso en los EE.UU/Imprimé aux É.-U.
  • Página 5: Juego De Bañera Y Paredes Divani

    MANUAL DE INSTALACIÓN JUEGO DE BAÑERA Y PAREDES DIVANI™ 8-11/32" N° de Modelo: 15-3/8 14-5/8 14-5/8 15-3/8 Cliente: Anote su número de modelo. Lo puede encontrar en la etiqueta, ubicada en el panel frontal de la caja. Es muy importante anotar su Lado de la cañería...
  • Página 6: Herramientas Y Materiales Necesarios

    HERRAMIENTAS Y MATERIALES NECESARIOS La instalación requiere herramientas hogareñas comunes y: • Nivel y escuadra • Cinta métrica • Martillo • Lápiz • In cartucho de sellador y uno de adhesivo, vea las especificaciones en los requisitos del juego de pared, más abajo. •...
  • Página 7 Instalación de Juego de Pared Si va a instalar una puerta de bañera, debe instalar una placa Marque y perfore un agujero de 3/16” en el centro del ala de de soporte (vea el tamaño en la Figura 1) en la parte de atrás fijación en la parte superior del panel en el centro de cada viga de las paredes de los costados.
  • Página 8: Cuidado Y Mantenimiento

    Figura 6 Masco Bath www.mascobath.com P/N27723 Rev. B 5/09 ©2009, Masco Bath Printed in USA/Impreso en los EE.UU/Imprimé aux É.-U.
  • Página 9: Ensemble Mural De Salle De Bain Divani

    GUIDE D’INSTALLATION ENSEMBLE MURAL DE SALLE DE BAIN DIVANI N° de modèle : 8-11/32" 15-3/8 14-5/8 14-5/8 15-3/8 Avis au client : Veuillez noter votre numéro de modèle. Le numéro du modèle se trouve sur une étiquette située sur le panneau avant de la Côté...
  • Página 10: Outils Et Matériaux Requis

    OUTILS ET MATÉRIAUX REQUIS : L’installation exige des outils domestiques communs et : • Niveau et équerre • Ruban à mesurer • Marteau • Crayon • Clous à toiture galvanisés de 3/4” • Sciages de 2’ x 4’ pour les colombages (au besoin) •...
  • Página 11 Installation de l’ensemble mural Si vous souhaitez installer une porte de baignoire, une planche Repérez un trou de 3/16” au centre de la bride de clouage, au d’appui (voyez la taille à la figure 1) doit être installée à l’arrière dessus du panneau, centré...
  • Página 12: Entretien Et Nettoyage

    Figure 6 Masco Bath www.mascobath.com P/N27723 Rev. B 5/09 ©2009, Masco Bath Printed in USA/Impreso en los EE.UU/Imprimé aux É.-U.

Tabla de contenido