Descargar Imprimir esta página

Rev-A-Shelf CROIBSL-COVER-52 Manual De Instrucciones página 4

Publicidad

METHOD 3
(MACHINE SCREWS & SPACERS
FOR 7/8" CLEARANCE)
STEP 1
Measure and pre-drill (4) pilot
holes using the 5/16" drill bit
(See Figure 3A).
STEP 2
From the top of the shelf line up
the spacers with the pre-drilled
holes, then line up the ironing
board frame with the spacers and
using (4) 1/4" - 20 x 1-3/4" truss
head screws and optional washers
secure it to the shelf.
Note: Install the machine screws
from under the shelf
(See Figure 3B).
ALL METHODS
STEP 3
Using the front finger slot, pull
the ironing board out, extend the
support rack and unfold the board
(See Figure 4).
4
FIG. 3A
SHELF
FIG. 3B
FIG. 4
Customer Service: 800-626-1126 | rev-a-shelf.com
Min. 22" (560 mm)
7-9/16" (192 mm)
5/16" (8 mm)
CENTER LINE
FRONT EDGE OF SHELF
Support Rack
Spacer

Publicidad

loading