(H)
(B)
(H)
(B)
(E)
(H)
(F)
(G)
Installation of the UV-C device (Drawing 2, manual B)
(N)
(N)
(W)
(V)
(S)
see Drawing 2
(V)
(O)
(I)
(P)
drawing 2
(V)
(V)
(T)
Installation of the dosing pumps
see drawing 5
(Y)
&
see drawing 2
(C)
(D)
(A)
(C)
(D)
(A)
(A)
(A)
(U)
(L)
(K)
(U)
(V)
see Drawing 2
(I)
(X)
(I)
(I)
and
(Drawing 5&6, manual B)
(G)
Key
10
sec
K
(K)
(M)
(I)
(X)
(U)
see
(T)
(
)
Instructions for use of the digital control panel
Important!
Never use an additional timer
Always test the water yourself, the system will not do this for you.
(E)
(F)