Input Power; Installation Steps; Important Notice - AirLive Live-5G Guia De Inicio Rapido

Ocultar thumbs Ver también para Live-5G:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
All manuals and user guides at all-guides.com

Input Power:

DC 5V 1A
Note: Use the power adapter packed with the device.
Incorrect power input can cause device damage.
LED Rules:
LED Indicator
Color
Power
Green
Link/Act
Green

Installation Steps

1. Remove the switch and accessories from the package.
2. Connect power to the switch. Make sure that "Power"
LED is on.
3. Connect devices to the switch, and check whether the
"Link/Act" light is on. If not, please make sure that power
is on for the other device or PC.
Live- 5G
5-Port Gigabit Ethern et S wi tch
Po wer
1
2
3
4

Important Notice:

1. The maximum cabling distance is 100 meters.
2. Do not create a network loop.
3. Always check the LED lights for troubleshooting.
Status
Meaning
ON
Power ON
OFF
Power OFF
ON
Port is connected
Blinking
Transmitting/Receiving
OFF
Port is not connected
Link /AC T
5
Live- 5G
5-Port Gigabit Ethern et S wi tch
Link /AC T
Po wer
1
2
3
4
5

Publicidad

Tabla de contenido
loading

Tabla de contenido