Polaris PowerFall Guia De Instalacion página 5

Ocultar thumbs Ver también para PowerFall:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
After notching the beam (setting blocks):
1. Determine water level with bender board.
2. Tack bender board at niche 1-3/8" below bottom of coping.
3. Cement back of board.
3
Setting the Waterfall
Create a bed of cement mortar in the niche to provide a solid base for the waterfall. Set the
unit into the mortar bed. The nozzle should extend 1" beyond gunite (or more for thicker
finishes like rock or brick) to ensure nozzle lip will be 1/4" past finished pool wall.
Tap in and level.
Shield unit from sun until a finish topping has been applied.
All manuals and user guides at all-guides.com
1-3/8"
www.polarispool.com
Bond Beam
Bender
Board
Ce m
e n t
3
1
2
Bender
Board
5
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

PowerstreamsFiberfall

Tabla de contenido