511290 & 511307
Kits hardware, including following parts
Kits de herrajes, incluyendo las siguientes piezas
Item
Artículo
Shelf clip
1
Ganchos para estantes
Shelf hole plug
2
Tapón para orificios de estantes
Bumper
3
Tapa a presión
Shelf glass
4
Protector de Borde
#8*1 1/2 inch Philips head screws
5
Tornillos Philips 1-1/2 inch, #8*
Wall anchors
6
Anclajes para pared
Shelf clip tape
7
Cinta para ganchos de estantes
STEP 1
Before cutting rough opening, check for pipes, electrical, or heating ducts. Plumbing and electrical lines
that interfere must be removed or relocated.
If it is required to remove part of stud, make sure that the wall is not a load bearing wall. Make sure
that there is structural support on both sides of the opening to attach the cabinet box.
Prepare an opening in the wall for the cabinet box. Refer to the SPECIFICATINS for rough wall opening
dimensions.
BATH CABINET HEIGHT SHOULD BE A MINIMUM 1INCH ABOVE FAUCET.
IT'S RECOMMENDED TO ATTACH FOOTER BETWEEN TWO STUDS TO HELP SUPPORT WEIGHT OF BATH CABINET.
PASO 1
Antes de realizar la abertura en bruto, controle que no haya tuberias, cables electricos o conductos de
calefaccion. Las lineas de plomeria y electricidad que interfieran deberan retirarse o reubicarse.
Si es necesario retirar parte de la viga, asegurese de que la pared no sea una pared de apoyo. Asegurese
de que haya soporte structural en ambos lados de la abertura antes de colocar el Gabinete.
Prepare una abertura en la pared pare el Gabinete. Consulte las ESPECIFICACIONES par aver las dimensiones
de la abertura en bruto.
LA ALTURA MINIMA DEL GABINETE PARA BANO DEBERA SER DE 1INCH POR ENCIMA DEL GRIFO.
SE RECOMIENDAINSTAN BASE ENTRE DOS VIGAS PARA QUE AYUDE A SOPORTAR EL PESO DEL GABINETE PARA BANO.
Description
Descripción
Drawing
Dibujo
Quantity
Cantidad
12
12
2
3
4
4
12