Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

9
200
272
2
1
1
2
1
1
2
12
68
±2
Installation
Equipment supplied
– Sponge rubber seal
– 4 spacer bolts
– 4 washers
– 10 nuts
yMounting dimensions
Installation in a control cabinet
Remove cap nuts and install the
t
spacer bolts in their place
(torque: 1 Nm).
2
Place the sponge rubber seal over the
t
back of the indicator.
Position the indicator in the metal
t
cut-out.
Fasten with washers and nuts
t
(torque: 1 Nm) so that the housing
issealed in accordance with its IP
protection rating.
For IP67 protection:
Run a bead of silicon sealant along the
t
junction of indicator and control panel.

English

+
Minebea Intec YAS07CI
3

Publicidad

Tabla de contenido
loading

Tabla de contenido