INSTALLATION
Typical Installation
INSTALLATION
Typical Installation
GAS-TIGHT BASIN
3/16" (4.8 mm) AIR BLEED HOLE IN DISCHARGE PIPE
PLACE PUMP ON HARD, LEVEL
SURFACE. NEVER PLACE DIRECTLY ON
CLAY, EARTH, OR GRAVEL SURFACE
4
SEPARATE PROTECTED AND GROUNDED SERVICE OUTLET, 4' FROM FLOOR MINIMUM
FLOAT SWITCH POWER CORD
PUMP POWER CORD
GATE VALVE
CHECK VALVE
DISCHARGE PIPE NO SMALLER
THAN PUMP OUTLET
2" OR 3" VENT PIPE
(51 OR 76 mm)
TETHER LENGTH:
3-1/2" (89 mm)
On: 13" (330 mm)
Off: 5" (127mm)
BASIN COVER
VERTICAL FLOAT SWITCH
On: 7" (178 mm)
Off: 2.25" (57 mm)