Battery Rack
SR Line
Please check the contents with
your packing slip.
Read instructions carefully.
Save this document for future
reference.
Two people are required for the
assembly.
Hardware
Pernos 1/4-20
Tools Required
Phillips #3
Setup
Check the levelling of the floor in order to determine
the critical areas. Use floor anchor plates #SH45 and
shim plates #SH46 to level the shelving units.
Make sure that no obstacle or electrical wiring comes
in contact with the structure.
Overall Dimensions
It is recommended to lay
out shelving positions on
the floor with a chalkline
before beginning the
installation.
(24'', 30'', 36", 42'', 48") + 1/2"
Note:
Refer to technical sheet
#S52 for more information.
rousseaumetal.com
1-800-463-4271
All manuals and user guides at all-guides.com
Assembly Guide
1/4-20 bolts
1/4-20 nuts
Tuercas 1/4-20
3S1801Z2
3A1818L2
5/8"
7/16"
13/16"
Guía de montaje
Security clips
Sujetadores de seguridad
Espaciador de postes
71011070
SR48
Controlar el nivel del piso para detectar los lugares
críticos. Usar las zapatas n.º SH45 y las cuñas de
espesor n.º SH46 para nivelar las estanterías.
SH45
Cerciorarse de que ningún obstáculo ni cable
eléctrico esté en contacto con la estructura.
SH46
48''
49 5/8"
Page/Página 1/4
Soporte para baterías
Línea SR
Verifique el contenido.
Lea atentamente las instrucciones.
Conserve estas instrucciones para
consultar en el futuro.
Se requieren dos personas para el
montaje.
Accesorios
Post spacer
(For back-to-back units)
(Para unidades detrás contra detrás)
Herramientas necesarias
Preparación
Dimensiones totales
Se recomienda trazar un plano
de posicionamiento en el piso
antes de comenzar la
instalación.
Nota:
Ver la ficha técnica n.º S52
para obtener más información.
S35-DE14S
7D000820S