All manuals and user guides at all-guides.com
Installing the Cage Nuts in the Rack
The cage nuts are installed on both vertical-rail mounting holes located at 4.3 and
13 inches above the bottom of the adjustable rail (see Figure 1-5). Use the following
procedure to install the cage nuts in the rack.
13 inches
4.3 inches
Figure 1-5. Locations for the Cage Nuts
1.
Insert the lower lip of the cage nut over the bottom of the opening in the back of
a rail as shown in Figure 1-6. Insert the small end of the cage-nut tool through the
opening in the rail (from the front) and hook the tool over the top lip of the cage
nut.
Dell PowerVault 130T Storage System Rack Kit Installation Guide
1-7