TH003 Thermometer Assembly
ASSEMBLY:
Time: 20-30 minutes
Tools: Screwdriver, Hammer
1) Base can be installed with adjustable screw-in foot tabs to stand on hard surfaces, stakes for
insertion into grass/soil surfaces, lag bolts for cement surfaces or wood screws for deck installa-
tion. Thread foot tabs or stakes into the four holes under base. If foot tabs are used, adjust height
as necessary leveling fixture for uneven surfaces. If stakes are used, find level, firm grass/soil
area for inserting stakes. If lag screws are used, insert lag screw and secure top portion onto base
using lock washer, washer and hex nut. If wood screws are used, screw firmly onto level wood
surface. Plug hole where screws were inserted with Hole Cover.
2) Attach decorative bottom to base. Next, attach bottom pole to base.
3) Slide decorative coupler onto bottom pole and slowly slide down to top of Decorative Bottom. (Do
not yet secure).
4) Thread top pole with mounting bracket to bottom pole. (If necessary, adjust height of bracket by
loosening screws and moving bracket to height desired and re-tightening screws.)
5) Slide decorative coupler back up to center of entire pole, so it covers the seam between top and
bottom poles. Using the provided Allen wrench, tighten threaded nipple embedded inside coupler
until coupler is tight and secure.
Parts:
Bottom
Decorative
Piece
Bottom
1 Pc.
Stake
Pole
4 Pcs.
1 Pc.
Vane
1 Pc.
NS Vane
1 Pc.
EW Vane
1 Pc.
40
50
30
60
20
70
10
80
90
%
0
100
HUMIDITY
Display Head
1 Pc.
Allen Wrench
1 Pc.
E1
All manuals and user guides at all-guides.com
Top Pole with
Thin Pipe
Large Pipe
Mounting
1 Pc.
1 Pc.
Bracket
1 Pc.
Ball
Coupler
Foot tab
1 Pc.
1 Pc.
Hex Nut
Wood
3 Pcs
Screw
Washer
3 Pcs
3 Pcs
Base
Lock Washer
1 Pc.
3 Pcs
Lag Bolt
3 Pcs
Decorative
Hole Covers
Sleeve
3 Pcs
1 Pc.
6) Mount display head to pole by
first sliding one end of bracket
through open-ended sleeve on
back of head. Then slide head
back in opposite direction, so
other end of bracket slides
through close-end sleeve.
7) Attach decorative bottom to
base. Next attached bottom
pole to base. After display
head is centered on the
brackets, secure display head
to pole by tightly threading
thumbscrews onto bracket.
8) Slide NS Vane (with imbedded
nipple) over top pole above
display head and secure it
to top of pole by tightening
imbedded nipple with Allen
wrench. Slide EW vane over
pole, so it rests on NS Vane.
9) Thread thin pipe onto top pole
and then slide large pipe over
thin pipe.
10) Slide remaining vane and ball
over pipe.
4 Pcs.
E2
Top Pole
Coupler
Bottom Pole
Decorative
Bottom
Foot
tab
Base
Steps 1-5
Allen Wrench
Decorative
Sleeve
Cement Installation
Wood Deck Installation
Stake