English
EN
Input Power:
Note: Use the power adapter packed with the device.
Incorrect power input can cause device damage.
LED Rules:
LED Indicator
Power
Link/Act
Installation Steps
1. Remove the switch and accessories from the package.
2. Connect power to the switch. Make sure that "Power"
LED is on.
3. Connect devices to the switch, and check whether the
"Link/Act" light is on. If not, please make sure that power
is on for the other device or PC.
Live-5Gv2
Power
Important Notice:
1. The maximum cabling distance is 100 meters.
2. Do not create a network loop.
3. Always check the LED lights for troubleshooting.
DC 5V 1A
Color
Status
Green
ON
OFF
Green
ON
Blinking
OFF
5-Port Gigabit Ethernet Switch
Link/ACT
1
2
3
4
5
Meaning
Power ON
Power OFF
Port is connected
Transmitting/Receiving
Port is not connected
Live-5Gv2
5-Port Gigabit Ethernet Switch
Link/ACT
Power
1
2
3
4
5