RPA Elite Series Projector Mount
1c
4
2
10
1
2
(A)
X 6
(B)
1
X 6
Threaded Rod Installation
The RPM can be secured to unistrut, angle or channel
assembly overhead structural members (trusses or I-
beams) using four 1/4" diameter threaded rods.
WARNING:
RESULT IN SERIOUS PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! Structural members
MUST be capable of supporting five times the
combined weight of all equipment being mounted.
1.
Carefully determine required mount position.
IMPORTANT ! : This will require knowing the lens
to screen distance see projector specifications for
set-up.
2.
Secure one end of the threaded rod to the structural
member.
3.
Install four 1/4-20 jam nuts on each threaded rod.
4.
Install the RPA on the threaded rod.
NOTE:
Holes in the RPA allow socket wrench access
without unit disassembly.
5
5.
Secure the RPM to the threaded rod using four
1/4-20 nuts.
X 4
PROJECTOR INSTALLATION
IMPORTANT ! : Model RPM uses Chief "SLB"
Series interface brackets and Models RPM-A,
RPM-B and RPM-C use Chief "SLM" Series
interface brackets.
Install Interface Bracket
NOTE:
If a model RPM-A, RPM-B, or RPM-C is being
installed, the interface bracket will be shipped
with thumb nuts attached and Locked into
place. If this is the case proceed to Step 2b
below.
1.
Assemble six Phillips flat head screws into bottom
of interface bracket.
2.
Thread six thumb screws onto six Phillips flat head
screws until screw end is visible in top of thumb
screw.
IMPORTANT ! : DO NOT fully tighten thumb
screws at this time.
Installation Instructions
IMPROPER INSTALLATION CAN